As a specialist in whole building essential services testing and asset management, Boar Group ensures that all equipment is documented, well maintained, and ready to operate at any time.
With an emphasis on practical solutions and providing exceptional attention to detail, Air Boar’s design team are renowned for working with clients and consultants to ensure system performance that exceeds expectations.
TAKE A LOOK AT OUR FEW RECENT PROJECTS
Objective: To complete interface testing as part of the end-of-Defects Liability Period (DLP) requirements, ensuring all HVAC and fire systems meet the client’s specifications.
Outcome:
Objective: Air Boar were engaged by a builder to conduct a gap analysis of existing HVAC and fire system interfaces, verify results against the current compliance matrix, and provide a comprehensive report with recommendations and repairs.
Outcome:
Each project demonstrated the successful collaboration between the HVAC and fire systems teams, ensuring safety, compliance, and operational excellence.
Objective: To perform routine compliance testing of HVAC and fire system interfaces, ensuring adherence to ongoing regulatory standards (QDC MP6.1) and operational efficiency, as per site specific matrix.
Outcome:
Feel free to contact us for any HVAC related services.
Contact Us